Introduction
Thank you for taking the time to visit this website, which has been created to provide you with an opportunity to engage with the pre-application consultation process.
This website enables the opportunity to provide your comments on an emerging proposal at Land South of Tewkesbury Meadow Tewkesbury. The proposal comprises the construction of around 300 new homes along with a parcel of land reserved for the Tewkesbury Scouts. The vehicular access to the site will be through Tewkesbury Meadow development which is currently under construction, with a bus and pedestrian only access onto Tredington Road, together with new public open space and associated green infrastructure.
The following sections of the website set out the initial details of the emerging proposals, along with a Feedback Survey in the final section.
Bloor Homes is also currently in pre-application consultation with Tewkesbury Borough Council, Gloucestershire County Council, National Highways and Local Stakeholders. Subject to the outcome of the pre-application consultation process, Bloor Homes anticipate submitting an outline planning application in Summer 2025.
About Bloor Homes
Since John Bloor built our first home in 1969, we've established a reputation for building quality homes that stand the test of time. The Bloor family still own and run the business today, ensuring high standards are maintained over 50 years later.
Our commitment to building quality homes is reflected in an incredible achievement: a 5-star Home Builders Federation rating for the 6th year running. What makes this truly special is that over 90% of our new homeowners would recommend us to family and friends.
Over the years, we have built in many locations across the area, including Tewkesbury, Cheltenham, Evesham and Worcester.
Tewkesbury Meadow Update
Since the commencement of the latest phase of Tewkesbury Meadow back in November 2024 comprising 238 new homes, public open space, and new community sports pavilion, Bloor Homes have completed the initial phase of works including site set up, and below ground infrastructure.
Construction has now begun on the new homes, and public open space. The new show home complex is due to open in autumn 2026, with the first new homes being occupied shortly after.
Formation of the new sport pitches commenced in June, and construction of the new sport pavilion will commence later this summer. It is anticipated that the pavilion and pitches will be completed by Summer 2026.
The Vision
The Vision for Land South of Tewkesbury Meadow is to create a seamless, well connected, sustainable extension of the Tewkesbury Meadow neighbourhood, which respects and enhances the character of the local area whilst delivering an attractive and accessible extension to the existing community.
Designed to respond to the challenges of the climate emergency by embracing sustainable design and connecting people with nature. The development will provide a mix of homes of various types and tenures to meet the local need, and new green infrastructure to promote a healthy and active community.
Integral to the new proposal is a 5,500sqm. area of dedicated open space for Tewkesbury Scouts. Currently the Scouts operate from a small building in Tewkesbury Town centre, without access to open space. At present, the Scouts have a waiting list of over 70 children, this area of open space will allow the Scouts to reduce the current waiting list and allow more young people across the borough to develop skills for life through fun activities, teamwork, and new challenges.
Site Overview
The site comprises agricultural fields located to the south of Tewkesbury Meadow and north of Tredington Road.
Landscape features within the site are generally limited but include hedgerows which run along the site's eastern, southern, western and part of the northern boundary as well as internal field boundaries. A group of existing trees are located centrally within the site. The site is generally flat with a gentle slope east towards a watercourse positioned east of the site.
To the north, the site adjoins the recently approved development at Tewkesbury Meadow, which comprises new dwellings, public open space, sports pavilion and pitches and is currently under construction.
Bloor Homes considers that the site in a highly sustainable location to deliver new housing and that it forms a logical extension to the wider existing development. The proposal will help to meet the local housing needs of the town by providing a range of market and affordable homes, as well as providing a new outdoor facility for the Tewkesbury Scouts.
The Proposal
The emerging indicative masterplan has been prepared in response to the site's constraints and opportunities and to reflect and interact with the local character of the area.
The layout has been designed to seamlessly connect with Tewkesbury Meadow to the north with residential development located within the centre of site. The landscaping will wrap around the boundaries of the site connecting with the development to the north and providing a community orchard, pedestrian routes throughout the open space and connections to Sherdon's Golf Centre. Within the centre of the site would be a children's play area (Local Equipped Area for Play). In addition, an area of open space is to be transferred to Tewkesbury Scouts.
The proposal is for the delivery of around 300 new homes. The new homes will include a mixture of 2, 3, 4 & 5 bedroom open market and affordable housing. A minimum of 40% affordable housing will be provided (around 120 homes), which subject to agreement with Tewkesbury Borough Council, will include a mixture of rented, shared ownership and First Homes.
Access into the development will be provided via the recently constructed junction from Bluebell Road to the north and through Tewkesbury Meadows. In addition, a bus only access is proposed from Tredington Road.
The proposed development will include new pedestrian and cycle connections between the proposed development and Tewkesbury Meadow to the north as well as onto Rudgeway Lane to the west.
Tewkesbury Scouts
The proposal will provide an area of open space, measuring approximately 5,500sqm, which is to be transferred to, and exclusively used by the Tewkesbury Scouts for outdoor activities.
The 3rd Tewkesbury Scouts group was formed 1930's and teach young people between the ages of 6 - 14yrs important skills for life. Currently the Scout Hut is located in Tewkesbury Town Centre, with no access to open space, nor the ability to expand and reduce the current waiting list of over 70 young people.
This new area of open space will allow the Scouts to expand and offer more young people the chance to develop skills for life through fun activities, teamwork, and new challenges.
Design
The Vision for Land South of Tewkesbury Meadow is to create a seamless, well connected, sustainable extension of the Tewkesbury Meadow neighbourhood, which respects and enhances the character of the local area whilst delivering an attractive and accessible extension to the existing community.
The proposals have been led by the design principles set out within the consented scheme to the north. This site has been designed as a landscape-led continuation of Tewkesbury Meadow.
- LANDSCAPE LED - the proposals have been led through landscape analysis leading to a sympathetic and integrated scheme with Tewkesbury Meadow. Opportunities to protect, enhance and manage important landscape features are integral to the development proposals.
- BUILD BEAUTIFUL - an assessment of the local context including the heritage assets at Rudgeway Farm and the retention of existing landscape features provides the opportunity to deliver a high quality, sustainable development as a continuation of Tewkesbury Meadow.
- DEVELOPMENT EFFICIENCY - the proposals demonstrate an efficient use of land through the application of appropriate densities providing around 300 residential dwellings, similar to the proposals to the north.
- CONNECTED GREEN INFRASTRUCTURE - Continuation of the western, central and eastern green corridors from Tewkesbury Meadow will benefit both new and existing residents. The retention of the existing landscape features, respecting the setting of the heritage assets and implementing the infrastructure constraints and easements will helped develop a strong landscape structure.
Technical Approach
Technical and supporting work has, and will continue to be undertaken to inform and influence the emerging proposal.
Highways
Land to the South of Tewkesbury Meadow has been designed to seamlessly integrate with the existing infrastructure while prioritising safety and accessibility. The primary vehicular access will be from the newly created priority T-junction at Bluebell Road, connecting to the northern section of the site via Tewkesbury Meadow. This access road will form an internal loop from north to south and will feature a minimum 6.2-metre carriageway designed to accommodate a bus route, complemented by a 2.0-metre footway on one side and a 3.0-metre shared footway/cycleway on the other, ensuring ample space for both pedestrians and cyclists. Additionally, a bus gate and emergency access point will be established at the south of the development from Tredington Road, linking to the main spine road and restricted to bus and emergency service use only.
Pedestrian and cyclist connections are a key focus, with routes designed to tie into the Tewkesbury Meadow development and Bluebell Road. Connections will also be provided onto Rudgeway Lane and Tredington Road, adhering to the Manual for Gloucestershire Streets guidance to ensure routes are coherent, direct, safe, comfortable, and attractive. A North-South Greenway and a circular pedestrian route will link the development to the existing trim trail in Tewkesbury Meadow and green corridors from Tewkesbury Meadow will be continued throughout the development.
Drainage
The layout has been arranged to locate all built development within Flood Zone 1, (land at a low probability of flooding from rivers). A small watercourse is present just off the eastern boundary of the site, and detailed hydraulic flood modelling of this has confirmed that it also poses a low risk of flooding to the development.
Environment Agency flood mapping indicates the potential for surface water flooding to occur at several isolated points across the site. However, these areas are associated with local topographical low points in which runoff from within the site could pond. This will be resolved through the implementation of a formalised surface water drainage strategy which will intercept storm water falling on the development and store it with designated basins/ponds before it is discharged from the site.
The additional surface water runoff generated by the development will be managed through implementation of a sustainable drainage strategy. The discharge rate from the development to the adjacent watercourse will be attenuated at the equivalent greenfield runoff rate, thereby mimicking the existing (pre-development) conditions. The excess surface water will be stored within Sustainable Drainage Systems (SuDS) which will be designed to accommodate the 1 in 100-year storm event with an uplift to account for future climate change. In addition to managing surface water quantity, the SuDS will provide treatment to the runoff from the development thereby also managing the quality of the surface water leaving the site. The SuDS will also provide opportunities to promote amenity and biodiversity benefits.
Surface water and foul water from the development will be drained separately. Foul water will be directed to the local public sewers. Bloor Homes will work with Severn Trent (the operator) to ensure that any necessary upgrades to the sewer network are implemented prior to occupation.
Heritage
With regards to built heritage, initial consideration has been made as to which assets might be potentially sensitive to residential development within the site. Initial consideration of Tewkesbury Abbey and the Church of St John the Baptist at Tredington concluded that they were not potentially sensitive, due to distance and the incidental nature of the intervisibilty of the site and the assets. Only the Listed buildings at Rudgeway Farm were considered to require detailed assessment of their settings.
Rudgeway Farmhouse and the Barn/Store which lie to the west of the site are Grade II Listed buildings. The Farmhouse is of 17th-century date, and the Barn/Store is of 19th-century date. The site is considered to contribute to the heritage significance of the assets through setting. The northwestern part of the site is understood to have formed part of the landholdings associated with the farmstead for a period of the farmstead's history, and the site is intervisible with the assets. The proposed development has been carefully designed to respect the setting of the assets, with a set back of built form in the north-western area of the site, behind the proposed orchard.
Ecology
A Preliminary Ecological Appraisal has been prepared which outlines baseline ecological features present on-site with reference to survey work that has been undertaken to date, and identifies the ecological opportunities and constraints associated with the proposed development.
The site comprises four grassland fields and one arable grassland ley field all enclosed by native hedgerows, several of which are associated with ditches. Additionally, the site features small areas of scrub and a pond bound by mature trees.
The arable habitat is considered to have limited ecological value whilst the grassland fields hold greater ecological interest, though this habitat is considered to be common and widespread in the local landscape. The pond, mature trees and native hedgerow network provide habitat opportunities for wildlife and offer connectivity to off-site habitats in the wider area.
Detailed botanical surveys of on-site habitats and protected species surveys for bats, reptiles and amphibians are underway or completed.
A Biodiversity Net Gain assessment will be prepared to support the scheme and identify the net change in biodiversity that will occur. Early considerations have been made to ensure that the proposals maximise biodiversity alongside development and achieve a 10% net gain, including the provision of new wildflower meadow, hedgerow, thicket and tree planting throughout the scheme as well as the delivery of new aquatic features on-site.
In Summary
The proposal comprises:
Housetypes Gallery
Images of other Bloor Homes developments.
Feedback Survey
The survey is now closed.
Should you wish to contact Bloor Homes to discuss the proposal, then please contact us via email.
We are a 5 star builder
Since 1969, we've always gone above and beyond for our customers. We do this by caring for you as much as we care about crafting the finest homes. For the seventh year running we have gained 5 star status for Customer Service by HBF, which is why 98% of our homeowners would recommend us to a friend.